27 June 2008: Decommissioned POC

The reconciliation manager wishes to advise participants of changes to the grid. As at 30 June 2008, the following POC will cease to exist:

Changes at MDN0142

Existing POC: MDN0142 MRPL GD
Flow Direction: X
End Date: 30 June 2008

The effective end date is considered a more convenient date to end the POC than one calendar month from the date of notification. The decommissioning of this POC is coincident with the decommissioning of MDN T2 in the system model. The physical supply point has been inactive for some time.


06 June 2008: New Embedded Networks

The reconciliation manager wishes to advise participants of two new embedded networks by New Zealand Retail Property Group Management Ltd. As at 01 July 2008, the following will be set up for the Milford and Highbury Shopping Centres:

NSP: MLF0011 NZRP EN
Name: Milford Shopping Centre
Parent NSP: ALB1101 UNET GN
Start Date: Tuesday 1 July 2008

NSP: HGH0011 NZRP EN
Name: Highbury Shopping Centre
Parent NSP: ALB1101 UNET GN
Start Date: Tuesday 1 July 2008


03 June 2008: New Embedded Network

The reconciliation manager wishes to advise participants of a new embedded network by Wel Energy. As at 05 June 2008, the following will be set up for the Belfast subdivision situated in Orions network:

NSP: BFT0111 WAIK EN
Name: Belfast
Parent NSP: PAP0111 ORON GN
Start Date: Thursday 5 June 2008


29 May 2008: Changes to the Grid

The reconciliation manager wishes to advise participants of changes to the grid. As at 01 May 2008, the following changes will take place:

Changes at ATI2201

Existing POC: ATI2201 MRPD GN
Flow Direction: X and I
End Date: 01 May 2008

Replaced by;

New POC: ATI2201 MRPL GN
Flow Direction: X and I
Start Date: 01 May 2008

Please notification results from a retraction by the Electricity Commission of the notification sent 15 May 2008: the network code is reverting back to MRPL The other POC mentioned in the 15 May 2008 notice, MAT1101, remains as notified (Party=BOPD)


19 May 2008: Updated Changes to the Grid HWA0331

The reconciliation manager wishes to advise participants of changes to the grid. As at 30 May 2008, the following changes will take place:

Changes at HWA0331

Existing POC: HWA0331 KUPE GD
Flow Direction: X and I
End Date: 30 May 2008

Replaced by;

New POC: HWA0332 KUPE GD
Flow Direction: X and I
End Date: 30 May 2008

This was previously advised on the 01/05/2008 as a new POC. The Grid Operator has advised that it wishes to model the new POC separately to the existing 33kV bus (POCO) hence the change of the KUPE bus from 0331 to 0332.