16 April 2014: Changes to Orion Balancing Areas

The reconciliation manager wishes to advise participants of new balancing area arrangements on the Orion Network from 14/04/2014, trading period 1.

The following points of connection will transfer from RNBAL02ORONG to RNBAL01ORONG from 14/04/2014 trading period 1.

HOR0331
HOR0661
KBY0661
KBY0662

As advised in previous notices, SPN0331 & SPN0661 will be decommissioned from 14/04/2014, trading period 1.


16 April 2014: New Embedded Network - revised

The reconciliation manager wishes to advise participants of a new embedded network operated by The Embedded Network Company. As at 01 July 2014, the following will be in place at 141 The Terrace, Wellington:

New NSP: TFJ0011 TENC EN
Name: Fujitsu Tower
Parent NSP: WIL0331 CKHK GN
Start Date: 01/07/2014

The embedded network will be globally reconciled.


11 April 2014: Changes to the grid

The reconciliation manager wishes to advise participants of a change to the grid. As at 01 June 2014, the following Point of Connection will change from X flow to X & I flow:

POC: Pen0251 NZRN GD
Flow Direction: X
End Date: 31 May 2014
Trading Period: 48

Changes to :

POC: Pen0251 NZRN GD
Flow Direction: X & I
Start Date: 01 June 2014
Trading Period: 1


03 April 2014: Decommissioning of embedded network

The reconciliation manager wishes to advise participants of the following decommissioning. As at 31 October 2013, the decommissioning of the following embedded network occurred:

Embedded Network: PAW0111 WAIK EN
Flow Direction: X
End Date: 31 October 2013
Trading Period: 48

All ICP's have been transferred back to the parent WRK0331 HAWK.


02 April 2014: Change to Embedded Networks

The reconciliation manager wishes to advise participants of the following decommissions. As at 31 March 2014, the decommissioning of the following embedded networks occurs:

Embedded Network: AOT0111 WAIK EN
Flow Direction: X
End Date: 31 March 2014 Trading Period: 48

Embedded Network: STR0111 WAIK EN
Flow Direction: X
End Date: 31 March 2014 Trading Period: 48

Embedded Network: SVW0111 WAIK EN
Flow Direction: X
End Date: 31 March 2014 Trading Period: 48

All remaining ICP's will be transferred to their parent NSP effective 01/04/2014;