What's new?

Subject:

27 March 2014: Changes to Embedded Network

The reconciliation manager wishes to advise participants of a change to an embedded network operated by NZAL. As at 01 April 2014, NSR0011 NZAL, will shift to be globally reconciled:

NSP: NSR0011 NZAL EN
Parent NSP: KWA0111 CKHK GN
Start Date: 01/04/2014

The embedded network will now be reconciled globally.


26 March 2014: Changes to the Grid

The reconciliation manager wishes to advise participants of changes to the grid. As at 01 May 2014, the following Points of Connection will change from X flow to X & I flow:

POC: ISL0661 ORON GN
Flow Direction: X
End Date: 30 April 2014
Trading Period: 48

Changes to :

POC: ISL0661 ORON GN
Flow Direction: X & I
Start Date: 01 May 2014
Trading Period: 1

And

POC: BRY0661 ORON GN
Flow Direction: X
End Date: 30 April 2014
Trading Period: 48

Changes to :

POC: BRY0661 ORON GN
Flow Direction: X & I
Start Date: 01 May 2014
Trading Period: 1


26 March 2014: Changes to the Grid

The reconciliation manager wishes to advise participants of changes to the grid. As at 30 April 2014, the decommissioning of the following Points of Connection will occur:

POC: OTA1101 CTCT GG
Flow Direction: X & I
End Date: 30 April 2014 Trading Period: 48

POC: OTA1102 CTCT GD
Flow Direction: X
End Date: 30 April 2014 Trading Period: 48


24 March 2014: New Embedded Network

The reconciliation manager wishes to advise participants of a proposed embedded network operated by The Embedded Network Company. As at 22 April 2014, the following will be in place at 1 Market Lane, Wellington:

New NSP: TML0011 TENC EN
Name: 1 Market Lane
Parent NSP: CPK0331 CKHK GN
Start Date: 22/04/2014

The embedded network will be reconciled by differencing.


21 March 2014: New Embedded Network

The reconciliation manager wishes to advise participants of a new embedded network operated by The Embedded Network Company. As at 01 May 2014, the following will be in place at 141 The Terrace, Wellington:

New NSP: TFJ0011 TENC EN
Name: Fujitsu Tower
Parent NSP: WIL0331 CKHK GN
Start Date: 01/05/2014

The embedded network will be globally reconciled.