What's new?

Subject:

10 March 2014: Changes to the Grid

The reconciliation manager wishes to advise participants of changes to the grid. As at 13 April 2014, the decommissioning of the following Points of Connection will occur:

POC: SPN0331 ORON GN
Name: Springston
Flow Direction: X
End Date: 13 April 2014 Trading Period: 48

Load will be moved to ISL0661 ORON GN;

POC: SPN0661 ORON GN
Name: Springston
Flow Direction: X & I
End Date: 13 April 2014 Trading Period: 48

Load will be moved to ISL0661 ORON GN;


10 March 2014: New Embedded Network

The reconciliation manager wishes to advise participants of a proposed embedded network operated by The Embedded Network Company. As at 10 April 2014, the following will be in place at 1-8 Clyde Quay Wharf, Wellington:

New NSP: TQW0011 TENC EN
Name: Clyde Quay Wharf
Parent NSP: CPK0331 CKHK GN
Start Date: 10/04/2014

The embedded network will be reconciled by differencing.


20 February 2014: Changes to the Grid

The reconciliation manager wishes to advise participants of changes to the grid. As at 31 March 2014, the decommissioning of the following Points of Connection will occur:

POC: PAL0331 OTPO GN
Name: Palmerston
Flow Direction: X
End Date: 31 March 2014 Trading Period: 48

Load will be moved to HWB1101 OTPO GN;

POC: BRY0111 GN ORON
Name: Bromley
Flow Direction: X
End Date: 31 March 2014 Trading Period: 48

Load will be moved to BRY0661 ORON GN;

As at 01 April 2014, the following new point of connection will be established:

New POC: HWB1101 OTPO GN
Name: Halfway Bush
Flow Direction: X
Start Date: 01 April 2014
Balancing Area: PALMSBYOTPOG


30 January 2014: Change to CRN0011

The reconciliation manager wishes to advise participants that from 01/02/2014, CRN0011 will be reconciled globally instead of by differencing.

NSP: CRN0011 DMFL EN
Name: 51 Corinthian Drive
Parent NSP: ALB 0331 UNET GN


24 January 2014: POC Decommissioning

The reconciliation manager wishes to advise participants of a change to the grid. MAT1102 will be decommissioned as at 27th February 2014:

POC: MAT1102 TRUS GG
Flow Direction: X & I
End Date: 27/02/2014